Mullins Branch – University of Arkansas
Projects
August 2025
Fayetteville, AR

Client
Watershed Conservation Resource Center
Location
Fayetteville, AR
Completion Date
August 2025
Construction Cost*
${acf_construction_cost}
Design & Permitting
Watershed Conservation Resource Center (WCRC)
*excluding materials
Summary
- Restored 800 feet of stream channel to improve water quality, ecology, and campus integration.
- Stabilized banks and added public access with native stone steps and in-stream structures.
Project Description
The Mullins Branch Restoration project restored an 800-foot reach of Mullins Branch on the University of Arkansas Fayetteville Campus utilizing Natural Channel Design principles and a variety of construction techniques to improve water quality, ecology, and aesthetics of the affected reach. The work involved stacked rock revetments, boulder grade control structures, channel shaping and grading, as well as creating public access points with stacked native stone steps.
McKisic Creek Greenway Stream Restoration
Previous Project
White River Magnus Streambank Stabilization and Enhanced Access
Next Project
