Clinton River
Projects
November 2021
Rochester Hills, Michigan

Client
Rochester Christian University
Location
Rochester Hills, Michigan
Completion Date
November 2021
Construction Cost*
${acf_construction_cost}
Design & Permitting
Green Watershed Restoration LLC
*excluding materials
Summary
- Completed an emergency realignment of 438 feet of the Clinton River to protect a dormitory threatened by a 30+ foot eroding sand bank.
- Relocated the channel across the valley, restoring it to its historic path and away from at-risk infrastructure.
- Stabilized the new channel using toe-wood, brush mattresses, and rock and log grade control structures.
Project Description
This project was an emergency restoration to prevent a dormitory from being washed into the Clinton River. The river had eroded into a 30+ foot tall sand bank which was only 20 feet from the back of a dormitory building on campus. The goal was to move the stream channel across the valley to its previous path and away from the at-risk infrastructure. The realignment included approximately 438 ft of stream channel. Natural Channel Design, such as toe-wood and brush mattresses, as well as rock and log grade control structures, was utilized.