Paint Rock River

Projects

June 2021

North Alabama

  • Client

    The Nature Conservancy

  • Location

    North Alabama

  • Completion Date

    June 2021

  • Construction Cost*

    ${acf_construction_cost}

  • Design & Permitting

    Civil and Environmental Consultants Inc.

*excluding materials

Summary

  • Stabilized approximately 300 feet of streambank in a high-value ecological system.
  • Used toe stone, root wads, and native materials to reduce erosion and support habitat.
Project Description

The Paint Rock River is a high-value ecological resource due to the unique habitats and species found there. Streambank erosion is the number one cause of habitat degradation on the Paint Rock. During assessment work, the Nature Conservancy identified several highly unstable sections of stream to focus restoration efforts. This project was identified and addressed one of the higher contributing streambanks. The restoration involved stabilizing approximately 300 ft of streambank with the use of longitudinal peaked toe stone with integrated root wads, bank grading and the installation of native sod mats.

Clinton River

Previous Project

New Stream Restoration Project

Next Project

Paint Rock River