Brentwood West Fork White River Stream Stabilization


Projects

March 2022

Brentwood, AR

  • Client

    Watershed Conservation Resource Center

  • Location

    Brentwood, AR

  • Completion Date

    March 2022

  • Construction Cost*

    ${acf_construction_cost}

  • Design & Permitting

    The Watershed Conservation Resource Center

*excluding materials

Summary

  • Stabilized approximately 1,500 feet of the West Fork of the White River.
  • Established new channel alignment with toe wood, grade control structures, and wetland features.
Project Description

This project addressed approximately 1500 feet of instability along the West Fork of the White River near Brentwood, AR.  Natural Channel Design principles were used to develop a new channel alignment with the appropriate dimensions, slopes and patterns.  Toe-wood structures were used to stabilize meander bends.  A combination of brush mattresses and rock revetments were used along the newly constructed banks.  Approximately 11 rock grade control structures were installed to prevent channel downcutting and ensure long-term stability.  Oxbow Wetlands were created to generate fill material and create additional wetland habitat.