Project

Sager Creek Phase II Restoration

  • Client

    Illinois River Watershed Partnership and City of Siloam Springs

  • Location

    Siloam Springs, Arkansas

  • Completion Date

    December 2023

*excluding materials

Summary

Flow State restored a 150-foot reach of Sager Creek, stabilizing active erosion and reinforcing channel structure within an otherwise stable corridor.

The Challenge

This section of creek was actively eroding, with little bank protection, despite being bordered upstream and downstream by stable channels and mature vegetation.

The Approach

The team installed approximately 100 feet of toe wood and added log veins for grade control and habitat. Streambanks were regraded and reinforced with native sod mats, plantings, and coir erosion control matting to prevent further loss.

The Outcome

The restored reach is now stable and aligned with surrounding channel conditions, supporting habitat while reducing the risk of continued erosion.

Project Highlights
  • 150 feet of stream restored
  • Toe wood and log vein structures installed
  • Native plantings and erosion control added
  • Improved long-term channel stability

Project

Sager Creek Phase II Restoration

Construction Cost*

$ {acf_construction_cost}

Design & Permitting

Flow State LLC

*excluding materials

Reducing flood risk and reconnecting a creek to its floodplain

Previous Project

Stabilizing an eroding reach within an otherwise healthy system